Vernon Drive

AMMCASS CE Group were engaged to deliver the full redevelopment and construction of two new 5-bedroom, two-storey semi-detached homes. The properties were designed to meet M4(3) accessibility standards, providing fully accessible living environments, and the project demonstrates our expertise in contractor-led design integration and Passivhaus construction principles.

Duration: 7 months

Project Type: Commercial Construction

About this project

Demolition & Site Clearance

  • Controlled demolition of the existing fire-damaged structure

  • Full compliance with current legislation and environmental best practice

  • Efficient site clearance to enable seamless progression into the construction phase

New Build Construction

  • Delivery of two 5-bedroom, two-storey semi-detached homes

  • Designed and built to M4(3) accessibility standards

  • Modern, spacious layouts tailored for inclusive living

  • Full compliance with Passivhaus principles and NHBC warranty standards

Accessibility & Inclusive Design

  • Level access throughout both properties

  • Integrated lift systems providing enhanced mobility support

  • Thoughtfully designed spaces that promote independence and long-term adaptability

Building Fabric & Energy Performance

  • High-performance building fabric and insulation systems

  • Energy-efficient installations to reduce long-term running costs

  • Durable, low-maintenance materials ensuring longevity and value

External & Infrastructure Works

  • Reconfiguration of existing parking bays

  • Careful integration with surrounding infrastructure

  • Cohesive external works to complement the local environment

Get in Touch

Ammcass Construction Engineering Group | All Rights Reserved | OUR PolicIES